 |
| |
Solutions Overview |
| Ensuring equipment and piping are adequately protected from potential overpressure |
| Overpressure Evaluation |
| Required equipment pressure relief system assessment for overpressure protection |
| Turnkey control and information monitoring system |
| Features & Benefits |
| Data Requirements |
| Additional Services |
| Engineering and consulting services to customers operating in the Process industry. |
|
|
 |
Deliverables
- Meets OSHA 29 CFR 1910.119 documentation guidelines
- Equipment database including all relevant parameters
- Repository includes all digital documents
- P&ID documentation
- ISO piping drawings - CAD drawings of all relief devices inlet/outlet piping
- CAD drawings of all flare header systems
- Original equipment data sheets, calculations, certifications
- Identification of all relief contingencies for all devices
- Quantification of required relief rates
- Orifice area calculations for all relief devices
- Inlet/Outlet piping loss calculations for all devices
- Mechanical evaluation of applicable devices (noise level, reaction forces, acoustical vibration analysis)
- Complete documentation package including all calculations, drawings, spec sheets, etc
- Automatic updating of files according to changes in codes
- Accessibility and standardization of enterprise wide users
- Wide variety of HTML reports
iPRSM® Systems Monitoring Software
The final deliverable is a Web based software solution that enables monitoring of all systems components from a single screen, employing the speed and access of the World Wide Web. Online viewing of system components includes online access to the following:
- Navigation through P& ID’s or System Sketches
Users can navigate to any piece of equipment from a P&ID or system sketch.
- Revision Control
History is managed and archived.
- Relief Load Calculations
Systematic identification of all potential overpressure scenarios and relief load calculations are determined and associated with each piece of equipment.
- Inlet/Outlet Pipe calculations
Includes inlet pipe loss calculation, force and moment calculations, acoustical induction vibration calculations, and noise level calculations.
- Two-phase flow calculations
Two-phase relief calculations are based upon the Design Institute of Emergency Relief Systems (DIERS) methodologies. The API Omega model has been standardized in iPRSM®. Equipment Libraries
Supports an unlimited number of equipment and device types
- Relief Valve -NB Redbook data
Contains information from National Board pressure relief certification data.
- Web Security
iPRSM® uses the web standard secure transport protocols (SSL encryptions & HTTPS) identical to all major financial institutions and secure e-commerce sites. Combined with complete user access controls, iPRSM® assures proper transaction management for concurrent users.
- Pipe Fitting Catalog
Contains a comprehensive library of inlet and outlet pipe fittings.
- Layers of Protection Analysis (LOPA)
iPRSM® application supports the LOPA simplified risk assessment methods.
Online Interface Functionality
- Physical Properties database
- "Smart" P & ID layouts
- "Protected systems" status at any plant

Asset Responsibilities Include:
- Plants are comprised of units and equipment assigned to units
- Units are comprised of protected systems
- Protected Systems are comprised of linked pieces of equipment
- Equipment provides protection, requires protection, or neither; equipment has fittings: inlet/outlet
- Overpressure contingencies are assigned to protected systems
- Associated documents are linked to equipment
Contact us for more info
|
|
 |